Installed Capacity

  • 133 MW

Nam Emoun Hydroelectric Dam is located in Dakchon Village, Dakcheung District, Xekong Province, which has an installed capacity of 133 MW. In 2013, an initial survey was conducted by GXED & CGGC, whose original project owner was TK Group.

PROJECT COST

$235 M

AVERAGE ANNUAL ENERGY

460.59 GWh

DAM HEIGHT

25.6 M

CATCHMENT AREA

Diversion Dam 254 Km2, Main Dam 208 Km2

Project milestones

  • Camp (office and staff accommodation) 100% 100%
  • Diversion Dam 79% 79%
  • Main Dam 100% 100%
  • Transmission Line 35% 35%
  • Switchyard 100% 100%
  • Tunnel 67% 67%
  • Electrical Plant 92% 92%
  • Road 75% 75%